Pouring the ground floor slab

Not ones to waste any time, the workers had already poured most of the ground floor slab by the time I visited the site at 10:00 am this morning.  The part that has not yet been filled with sand and steel re-enforcment, that you can see in the video, is where the ground floor bathroom and garden store room will be. The floor for these two rooms is at a lower level than the rest of the floor, so will be poured separately once the main floor casting has set.