Roof completed, block work nearly finished

The roof is now on and some of the architectural features in the roof area have also been cast in concrete.  We are a couple of days away from finishing all of the block work and installing the windows.  After the block work is complete and the walls have been rendered we will then begin adding the the remaining architectural detailing.

With this project, the terms of the contract we such that we would be carrying out all works except the carpentry work and tiling, which will be carried out by a friend of the owner. (We will, however be tiling the bathrooms to facilitate installation of bathroom fittings.)  As such, the beautiful wooden window and door frames have been supplied to us for installation and we can not take credit for the excellent craftsmanship of them in this case!