Roof tiling and wall rendering

Since last posting about this project, we have completed all of the main concrete structural framework, poured the floor slabs and completed all of the major blockwork.   Rendering is nearly complete as is the roof framework. We are mow moving onto the roof tiling.   We have also been working on a number of other sub-projects located throughout the plot of land around the house, but I shall detail these later in a separate post.